Accessible, Removable, Recyclable Walls For Maximum Facility Management
Patented Process
Shown below is the installation process for our patented Green-Zip process.
Installation
Step 1
Attach drywall to metal studs with removable screws at panel edges as specified. At "middle" studs apply two parallel 3 inches long & about ¾ inch diameter beads of releasable adhesive about every 3 feet on middle stud.
Step 2A
Omit under layer of joint compound
Step 2B
Apply self-adhesive Green-Zip Tape™ directly over Screws & Joint as shown above. Only Green-Zip Tape™ passed tests to deconstruct when mud "fully" cured. It is the only tape to qualify for license to use Patent protected methods.
Step 3
Float the finish
Coat of mud compound over the Green-Zip Tape™
Step 4
Leave a "tab" at the end of the Green-Zip Tape un-floated; & covered by carpet or folded under base
With the final result being a high quality finish to the wall
Disassemble
Step 1
Remove Wall Base (or Carpet) to expose the "pull-tab" that was left un-floated
Step 2
Grasp the "pull-tab" at the floor and pull or "zip" up the
Green-Zip Tape™
Step 3
"zip up" the Green-Zip Tape™ to expose the screws
Step 4
Remove the screws.
Step 5
Remove the gypsum panels and stack on cart for reuse.
Step 6
Remove the studs and stack on cart for reuse.